This book covers execution of mega industrial projects especially in oil and gas industries covering engineering, procurement, construction, commissioning and performance testing. It enumerates various tasks and deliverables under each discipline and sub-disciplines to define the detailed scope of work, supplies and services, as per level III of Prima Vera Schedule developed from the contract-based schedule. It gives an overall idea of how a project rolls out from commencement date to initial acceptance and executed practically with total contractor’s scope of work broken down into tasks/activities at level III platform, while highlighting that support for fool proof project execution.

Table of Contents

SECTION I PLANNING AND EXECUTION IN LEVEL 3

1 Management, Control and Administration

2 HSE, Social and Security

3 Services and Facilities to Owner

4 Engineering

5 Procurement and Supply

6 Transport, Logistic and Storage

7 Construction

8 Pre-Commissioning

9 Commissioning, Start-up and Performance Test

10 Temporary Facilities

SECTION II COMMERCIAL ASPECTS

11 Commencement Date and Effective Dates

12 Extension of Time

13 Professionally Handling Large Claims

14 Prolongation and Disruption Costs

15 Penalty/Interest for Payment Delays

16 Force Majeure

17 Concurrent Delays

18 Hedging against Currency Fluctuations

19 Indemnity

20 Consequential, Indirect Damages

21 Laws and Regulations

22 Escalation

23 Liens

24 Total Liability

25 Payment Terms

26 Planning

27 Progress Measurement

28 EOT claim

29 Interpretation Rules

30 Change/Variations/Trend Notices

31 Contract Price below Floor Price and Consequences

32 Owner’s Delay on Document Approval

33 Insurances

SECTION III TECHNICAL ASPECTS

34 Life Cycle Cost Analysis (LCCA)

35 Consequences of Delayed Rigless Test on Wells (Owner Delays)

36 Strategy for using Non-Spec Feedstock for Commissioning

37 Gas In and Authority Check points

38 Value Engineering

39 Design Defect, Construction Defect and Damages

40 NDT (Non-Destructive Testing)

41 Destructive Testing

42 Hydrostatic Leak Test

43 Heavy Lift Load Sharing for Cranes

SECTION IV GLOSSARY OF ABBREVIATIONS, NAMES AND MEANING

APPENDIX

Project Organization

Contract Price Weight Factor

Monthly Status Report Contents

Material Requisition Cycle(MR)

FEED Deliverable List

Process Block Flow Diagram

Document Categories

Claims and Liens Release Letter

Prolongation and Disruption Cost: Hudson formula

A typical list of Procedures and Plans

Total Plant Break down into Areas

...
View More
View Less

Author(s)

Biography

Soosaiya Anthreas graduated from CIT in Mechanical Engineering. He has thirty four years of experience from mega industrial projects in the field of project development, project management and project construction. He worked in global EPC companies like Samsung Engineering and Technip FMC. As a weekend novelist, he published his first literary fiction novel, The Dance of the Sea. He lives in Chennai with wife and son..

Related Titles
Related Subjects
Project Management Engineering Project Management Engineering Management Project Management Energy, Fuels & Petrochemicals Building Project Management Petroleum & Oil Industries Engineering Management Power & Energy