This book covers execution of mega industrial projects especially in oil and gas industries covering engineering, procurement, construction, commissioning and performance testing. It enumerates various tasks and deliverables under each discipline and sub-disciplines to define the detailed scope of work, supplies and services, as per level III of Prima Vera Schedule developed from the contract-based schedule. It gives an overall idea of how a project rolls out from commencement date to initial acceptance and executed practically with total contractor’s scope of work broken down into tasks/activities at level III platform, while highlighting that support for fool proof project execution.
SECTION I PLANNING AND EXECUTION IN LEVEL 3
1 Management, Control and Administration
2 HSE, Social and Security
3 Services and Facilities to Owner
4 Engineering
5 Procurement and Supply
6 Transport, Logistic and Storage
7 Construction
8 Pre-Commissioning
9 Commissioning, Start-up and Performance Test
10 Temporary Facilities
SECTION II COMMERCIAL ASPECTS
11 Commencement Date and Effective Dates
12 Extension of Time
13 Professionally Handling Large Claims
14 Prolongation and Disruption Costs
15 Penalty/Interest for Payment Delays
16 Force Majeure
17 Concurrent Delays
18 Hedging against Currency Fluctuations
19 Indemnity
20 Consequential, Indirect Damages
21 Laws and Regulations
22 Escalation
23 Liens
24 Total Liability
25 Payment Terms
26 Planning
27 Progress Measurement
28 EOT claim
29 Interpretation Rules
30 Change/Variations/Trend Notices
31 Contract Price below Floor Price and Consequences
32 Owner’s Delay on Document Approval
33 Insurances
SECTION III TECHNICAL ASPECTS
34 Life Cycle Cost Analysis (LCCA)
35 Consequences of Delayed Rigless Test on Wells (Owner Delays)
36 Strategy for using Non-Spec Feedstock for Commissioning
37 Gas In and Authority Check points
38 Value Engineering
39 Design Defect, Construction Defect and Damages
40 NDT (Non-Destructive Testing)
41 Destructive Testing
42 Hydrostatic Leak Test
43 Heavy Lift Load Sharing for Cranes
SECTION IV GLOSSARY OF ABBREVIATIONS, NAMES AND MEANING
APPENDIX
Project Organization
Contract Price Weight Factor
Monthly Status Report Contents
Material Requisition Cycle(MR)
FEED Deliverable List
Process Block Flow Diagram
Document Categories
Claims and Liens Release Letter
Prolongation and Disruption Cost: Hudson formula
A typical list of Procedures and Plans
Total Plant Break down into Areas
Soosaiya Anthreas graduated from CIT in Mechanical Engineering. He has thirty four years of experience from mega industrial projects in the field of project development, project management and project construction. He worked in global EPC companies like Samsung Engineering and Technip FMC. As a weekend novelist, he published his first literary fiction novel, The Dance of the Sea. He lives in Chennai with wife and son..